Feeds:
Posts
Comments

Posts Tagged ‘Buffalo Bayou’

BY HANIYA RAE

Technology helps shape what hardscapes can be.

FROM THE DECEMBER 2018 ISSUE OF LANDSCAPE ARCHITECTURE MAGAZINE.

Courtney Goode was working on a project in Houston when Hurricane Harvey hit. Buffalo Bayou, one of the slow-moving rivers that Houston relies upon to hold stormwater, flooded, and the waters would end up spilling out over the city’s aging infrastructure and impermeable surfaces, exacerbating the problem.

“My heart was in my throat,” Goode says. “We had been working on these super-detailed axonometric drawings of all angles of the city—we knew the city like the back of our eyelids. It was a total shock to see the bayous obliterated and murky, debris-filled water covering the walkways, roads, and even ground floors of the buildings near the bayou. The flood just engulfed everything we had been designing.”

For Goode, a landscape designer in Sasaki’s Urban Studio and a Fabrication Studio coordinator, the disaster afforded her a very real account of how the city managed stormwater and led her to think more about how low-impact development can divert stormwater from streets during flooding. She describes a scenario in which a city like Houston could divert some of the excess water by excavating 40-foot-deep gravel dry wells (the size of a typical four-story parking garage) topped off with permeable pavers that could hold excess rainwater until it’s able to seep back into the ground. (more…)

Read Full Post »

BY BRIAN BARTH

Parks and bike paths embroider the city in the Bayou Greenway Initiative plan.

Parks and bike paths embroider the city in the Bayou Greenway Initiative Plan.

From the March 2016 issue of Landscape Architecture Magazine.

Kinder Baumgardner, ASLA, the president of SWA Group and the managing principal of its Houston office, is not the type of landscape architect to shy away from controversial ideas. In 2013, at the zenith of the vitriolic debate around the proposed Keystone XL pipeline, he sent an unsolicited design proposal to the White House, the State Department, the Department of Energy, the Department of Commerce, and a slew of other federal agencies with a stake in the project. In it were a set of overlay maps of the proposed route that illustrated various ecological and cultural dimensions of the pipeline landscape, as well as a set of renderings suggesting that a bike path be built within the pipeline corridor from its starting point in Hardisty, Alberta, down to the terminus in Port Arthur, Texas, near Houston.

“It was roundly hated,” says Baumgardner of the idea, insisting it was not an endorsement of the pipeline but an attempt to puncture the status quo notion of “infrastructure as a one-dimensional thing.” Reactions were neatly divided along ideological lines. “Some people saw it as: ‘You’re trying to make this bad thing better, and that might mean it would get built.’ On the other side, people who were much more conservative were saying, ‘You shouldn’t be doing this; it’s going to make it difficult to operate and they’ll end up closing it down.’”

The Obama administration recently gave what appears to be the final ax to the (more…)

Read Full Post »